Search This Blog

Showing posts with label Vila do Porto. Show all posts
Showing posts with label Vila do Porto. Show all posts

Wednesday, June 14, 2017

2017 Sail Vila do Porto, Santa Maria to Ponta Delgada, Sao Miguel, Azores


Left our mooring in Vila do Porto on Santa Maria at 0700 hrs 14/06/2017
And headed round the SWestern tip of Santa Maria on a NNWerly course 
to Ponta Delgada on Sao Miguel, some 50 NMiles away. 
Our friends Stefan and Anna on S/V Zanzibar and Theo & Michelle on 
S/V Faja Lobi left at more or less the same time. 
The wind was a very pleasant SW 4 giving us a delightful beam reach. 
A pod of dolphins played alongside for a while. 
By 1500hrs, Sao Miguel came into view.  
Moored in Ponta Delgada on Sao Miguel in box 10 around 
1600hrs 14/6/2017 - total distance 56.5 NMiles in 9 hrs

Thursday, June 8, 2017

2017 Hike Santa Maria PR 05 SMA Trilho da Costa Sul

At 11.15 hrs 8/6/17 Mike exited  Vila do Porto marina by its NE corner to join the Trilho da Costa Sul hike PR 05 SMA


Leaving the marina area

Crossing the small stream on the other side of the beach

Eventually joined the official trail, with views of Vila do Porto on the other side of the valley

View of Vila do Porto marina

The trail follows the walkway built at the site of the Pedreira Campo Figueral Prainha National monument 

This is an ancient quarry where building materials - Limestones and sandstones used to be extracted. Sedimentary rocks are rarely found in these volcanic islands. The rocks have abundant fossils


Shortly after the quarry, the trail enters some woods and goes past some old man-3made caves which were used to extract limestone



There are stunning coastal views along much of the trail







The coastal town of Praia comes into view - 1 1/2 hours from the marina. Here, I decided to retrace my steps and return to the marina.


On 12/6/17 I repeated the hike with Theo & Michelle from S/V Faja Lobi, but this time continued down to Praia and took a taxi back to Vila do Porto. This time we started the hike at 1200 hrs .




After steep undulating descents , the trail reaches the beach

The trail can be a bit tricky to follow at high water - low water would be advisable





Trying to avoid a drenching from breaking waves - makes for an amusing route if one is nimble enough and doesn't mind getting wet


Finally arrived in Praia at 1600 hrs (after 4 hrs) and called a taxi from a cafe there - €10 back to Vila do Porto. 

See blog of 28/6/2012 for the first time that we walked this trail.

Descriptions of this, and other trails in the Azores , can be found with the below link

Sunday, October 2, 2016

2016 Sail Santa Maria to Gran Canaria 1 August 2016

The weather forecast looked good for our 730 NMile sail from Santa Maia  back to Las Palmas - wind direction mainy from the NE starting off light as the Azores High was centred over the Azores, increasing to a 4 Bft with the chance of a 5 Bft after a couple of days.
 

 

So we left Vila do Porto Marina, Santa Maria at 0845 hrs Monday 1st August 2016 in calm seas in a light ENE1 Bft wind. 
 
Shortly after leaving we noticed that reef nr 1 was not properly rigged so Mike corrected this
 
The wind remained very light but slowly increased as we motored at 5 to 6 knts out of the Azores High. 
At 1645 hrs the next day (2/8) the wind had increased to a NNE3/4 (around 10 knots) and we unfurled the Genny and started sailing on a beam reach on course 137 deg at 5 knots SOG.
 

 
The sunset around 2030hrs - beautiful sky just before dark at 2123 hrs
 
The wind strength steadily increased during the evening to 16 kts and at 2240 we furled the Genny to the first reefing point.
At 0530 hrs 3/8, dawn was breaking
 
By 1400hrs the wind was 16 to 18 kts from the ENE , sailing 60 degrees to wind at 6 knts 
 
 
 
Via our Satellite Iridium phone/redbox equipment, we downloaded the latest Grib Files from   Which indicated that the wind would increase further during the next couple of days
 
So we put 2 reefs in the mainsail and 2 reefs in Genny - had a mishap in lowering the Mainsail resulting in snapping the starboard Lazy Jack line - briefly motored into the wind to rerig it.

Sunset 2150 3/8/2016, Sailing in NE 4 BFt making 5 to 6 kts
almost cloudless. seas getting choppier
 

Wind steadily increased during the night gusting upper 20's with the sea becoming rough with waves breaking over deck and sometimes water coming over the sprayhood into the cockpit.
The wind increased further during the morning of 4/8 gusting 34 kts {7 Bft} on the beam so put in the3rd reef and furled the Genny to a very small sail. Waves 2 to 3 meters, sun & cloud. Speed 5 to 7 kts course 136 deg.
Had another rough night 4 to 5/8 with wind often over 32 knots from NE and 
at 0330 hrs wind suddenly dropped  and then headed us.
We finally got sailing again with autopilot on 50 deg app wind setting as Track setting would not handle it. We were sailing with 3 reefs main in  a 6/7 Bft 25 to 34 kt ENE wind and small genny making only 4 to 5 knots - any faster and Dutch Link behaved more like a submarine with waves 3 to 4 meters high and white 
horses everywhere. Waves occassionally breaking into the cockpit.
At 0415 hrs 5/8 reached for the Genny reefing winch and felt something slimy - turned out to be a squid that had come on board with one of the breaking waves!
 
The wind stay in the 6/7 Bft range until around 0420 hrs 6/8 when the world changed for us.
Mike gat a call from Jeannette who had the watch, to say that the mountainous waves had miraculously 
disappeared and the  wind was down to a pleasant 4 Bft.
So 3rd reef out (only 2 in now) and gradually unfurled Genny we were saiing 
at 55 degress to a nice NE 4 at 5 to 6 knots with hardly any water over the deck and could 
almost stand up in boat without holding on - wonderful.
Mike went to the forepeak to retie the anchor which had become a bit loose.
Time to relax
 
Ship ahoy
 
Las Palmas's La Isletta in view
 
Just about to enter Las Palmas harbour with an almost Full Moon to greet us
 
 
21.30 hrs moored in our berth at the Club Varadera , Las Palmas having covered 731 nautical miles in 5.5 days, average speed 5.5 knts , sailed 4 days, motored 1.5 days

Sunday, August 7, 2016

Sail Sao Miguel to Santa Maria 30 July 2016

Saturday 30 July 2016 left berth on I pontoon in new Ponta Delgada Marina at 0735 hrs

 

 

 
and set sail for the 53 nMile trip to Santa Maria
 
Leaving Ponta Delgada
 

 
The wind was a light NNEerly 2 to 3 Bft 
 
We tried to sail, rigging a strop to prevent the Genny sheet from shafing on the guard rail as, with such a light wind from aft of the beam, the Genny was flogging a bit
 

 
After 2 hours of sailing, we gave up as the wind became less and we motored the rest of the way
 
Leaving Sao Miguel behind
 

 
At 1340 hrs, Santa Maria appeared ahead of us, still some  25 nmiles away
 
Getting closer
 

 

 

 
Arrived in Vila do Porto at 1720 hrs and were lucky to be able to fill our diesel tanks before going to our berth on C pontoon close to the small crane
 
Dutch Link moored on C pontoon - close to Oasis